March until May 2009
– Topssides anticorrosion treatment and repaint under climate controlled cover
– Main deck inner bulwark local anticorrosion treatment and repaint
– Main deck inner walls cleaning and local repaint
– Anchor pockets and hull protection modification
– Main engine exhaust outlets modification
– Underwater repaint with local sandblasting and raising 30 cm the waterline